Register of Sites

The register lists every site and route held by the Interior Department of the Velocity Interoperability Network on behalf of members. Each entry is recorded against one of the classes described under Infrastructure, and each is operated to the service standard from the day it is entered as In service. The register is revised as sites and routes are transferred to the Department. How members connect to the sites and routes it lists is described under Connecting to Shared Infrastructure.

The register is accompanied by a schedule of principal plant, which records the masts, buildings, generators, power supplies and cooling plant installed at each site and the date of the next inspection. The land on which each site stands is recorded separately under Land and Wayleaves.

4
Relay sites
2
Exchange points
1
Data hall
5
Cabling routes

Sites and routes

Register as at 6 September 2026
ReferenceClassDescriptionStatus
RS-01Relay siteStaffed relay site, northern districtIn service
RS-02Relay siteUnstaffed relay site, eastern districtIn service
RS-03Relay siteUnstaffed relay site, southern districtIn service
RS-04Relay siteStaffed relay site, western districtUnder transfer
XP-01Exchange pointCentral exchange pointIn service
XP-02Exchange pointSecondary exchange point, eastern districtPlanned
DH-01Data hallShared data hall at departmental premisesIn service
CR-01CablingFibre route, RS-01 to XP-01In service
CR-02CablingFibre route, RS-02 to XP-01In service
CR-03CablingFibre route, RS-03 to XP-01In service
CR-04CablingCopper route, XP-01 to DH-01In service
CR-05CablingFibre route, RS-04 to XP-02Planned

Status

In service
Held by the Department and available to members under the usual obligations. The service standard applies from the date of entry.
Under transfer
Agreed for transfer from a member and awaiting completion. The transferring member remains responsible for the site or route until it is entered as In service.
Planned
Approved by members but not yet built or transferred. Dates for construction are given in the schedule of planned works as they are fixed.

Cabling routes

Five cabling routes connect the relay sites and the data hall to the central exchange point. Four are fibre. The fifth, the copper route between the central exchange point and the shared data hall, is the oldest plant on the register and is to be replaced with fibre in October 2026 under the schedule of planned works.

Cabling is leased to members by the route. A member's own fibre may be laid in a shared duct under a wayleave, which is recorded against the corridor the route follows.

Planned Works

Green cable wound on a drum
Photo: Kay Nauwelaerts

Schedule of principal plant

Plant as at 6 September 2026
ReferenceSite or routeAssetInstalledNext inspection
PL-01RS-01Lattice mast, 40 metres2019March 2027
PL-02RS-01Standby generator and fuel store2021Tested monthly
PL-03RS-01Equipment building, staffed2019March 2027
PL-04RS-02Monopole mast, 30 metres202228 September 2026
PL-05RS-02Equipment shelter, unstaffed2022March 2027
PL-06RS-03Monopole mast, 30 metres2020March 2027
PL-07RS-03Equipment shelter, unstaffed2020March 2027
PL-08XP-01Switching hall and member cabinets2018September 2027
PL-09DH-01Cooling plant202321 September 2026
PL-10DH-01Uninterruptible power supply and batteries2023December 2026
PL-11CR-01Duct run, 18 kilometres2019September 2027
PL-12CR-04Copper route, 3 kilometres, to be replaced October 20262018Not applicable

Corrections

Corrections to the register or to the schedule of plant may be sent to contact@interior.gov.vin. The procedure by which a site or route is entered on the register is described under How We Work.